More and more mainstream analysts are identifying the coming AI crash, which is a good indication that it will happen soon.
So, what happens to all the data centers? They are already built but probably very expensive to maintain. Will many of them just be abandoned? Bought up by cloud computing companies? Scammers? Crypto miners? Can they be parted out and sold off piecemeal?
Will they be put to some productive use, or just become massive e-waste sites left to the locals to deal with?


The ones being built or planned to be built will have to be sold off.
Probably not abadndoned, but land owner changing several hands in what is essentially someone buying a vacant lot. Maybe a handful will reuse any existing building already made, but most will be used for something new.
The existing ones will start their fight to the lowest market price which will probably cause many to either sell to a different cloud provider or change hardware to something more profitable.
None of the electronic hardware will go to waste because there will always be a demand for it, even if they sell it off at a loss. But any permanent fixtures like industrial cabling, ventilation, piping, etc probably will be wasted.
There’s still no guarantee on whether it’ll implode or just slowly deflate though. The natural assumption would be that the post IPO pricing will completely wreck sales and value, but they could easily move to an enterprise vendor lock scenario where they can charge whatever they want due to tech stack deals like how MSFT runs teams.
Remember, they’ll do anything in their power to keep the pumping going, even if it involves tax bailouts.
Hire funny wood it be if they tried to get a tax bail out and Trump approved it but he actually can’t do it since there’s no money left to bail them out